Skip to content
Product

Projects. Organize production decisions.

A project holds one production’s candidates, comparisons, and decisions in one place — so the shortlist stops living in screenshots and chats, and the state of the shoot is always readable.

Compare

Candidates side by side — production fit, scout score, lighting, materials, and permit confidence, with differences called out.

Decisions

Approve, hold, or reject each location. A decision is never lost — it stays with the project, with room for the reason.

Executive Brief

The production’s live summary: shortlist health, strengths, missing capabilities, and the next steps that move the shoot forward.


Try it

Walk a shortlist to a decision.

Three illustrative candidates, the real Compare interface, and the real Executive Brief. Approve one — then hold another — and watch the brief re-plan the production under your hands.

Compare locations

Concrete Gallery Hall

Mitte, Berlin (illustrative)

Riverside Brutalist Annex

Kreuzberg, Berlin (illustrative)

Museum Court B

Tiergarten, Berlin (illustrative)

Production fitDiffers
70 fit · 80 signal
50 fit · 100 signal
50 fit · 100 signal
Scout scoreDiffers
86
79
74
LightingDiffers
Hard directional daylight — Clerestory windows throw sharp diagonals across the east wall before noon.
Mixed — top light in the stair core
Late morning, clear days
Architecture & materialsDiffers
concrete · glass · brutalist · stark
concrete · monumental · raw
concrete · stone · geometric · stark
Parking
Unknown — verify
Unknown — verify
Unknown — verify
Access
Unknown — verify
Unknown — verify
Unknown — verify
Permit confidenceDiffers
ask first — Interior filming requires venue approval; weekday mornings quietest.
ask first — Managed building — production access negotiable off-peak.
Courtyard is semi-public — small crews usually fine, verify for rigs.
Your notes
Decision

The Executive Brief below is computed live by the same production-intelligence engine the workspace uses — approve or hold a location above and watch it update.

Executive producer15% healthThin

Thin — 0 approved, 0 on hold, 3 to review.

Current focus: Building the shortlist — no locations approved yet.

Shortlist

0 IN · 0 HOLD · 0 OUT · 3 · 3 backups

Strengths

Backup depth: 3 options on hold or under review.

Missing capabilities

Need: More approved options (only 0 so far).

Next steps

  1. Mark your leading candidates as IN.
  2. Search for an option with museum or brutalist.
  3. Decide on 3 undecided locations.

Live demo — this is the real shipped interface and the real deterministic intelligence. The three locations are illustrative; nothing you click is saved.